A house with very low energy costs! Houses
GreenCube Pille combined solution
A smaller house with lower running costs.
- Request a quote
- Request a quote
All models can be adapted to your wishes. The detailed floor plan of every building is created together with the client.
Construction quality
The building frame is supported by glued laminated timber (GL24 strength class; 120×360). All structural timber used in the building is C24 strength grade. On the inside, the studs are covered with OSB board, which gives the building rigidity and makes it possible to mount shelves, a television and other items on the walls.
The building has a compliant vapour barrier and wind-protection gypsum board on the outside, together with ventilation battens and timber cladding. The wall construction is airtight and highly insulated.
The floor has 300 mm of insulation and the walls and roof ceiling have 200 mm. Thermal bridges are minimised during installation. The building has a durable RUUKKI roof and triple-glazed windows for additional thermal performance.
Every detail matters!
GreenCube places great emphasis on even the smallest details. Every building that leaves our factory is finished to a high standard.
Everything you need can be included!
At the client’s request, the building can be equipped with everything needed for immediate use.
All GreenCube buildings also include a heating cable that helps prevent pipes from freezing even during severe frost.
Completed solutions
Gallery
Created with the client
Recommended floor plans
100% of floor plans are created in cooperation with the client!
Transport and installation
The building is transported to the site in three sections. The module is insured and weatherproof packed. Assembly takes up to two days.
The building is connected to utilities (electricity, water and sewerage) before final handover.
The construction process can be followed by visiting the site on working days by prior arrangement.
The buildings are completed at our production facility in Lihula. Our aim is to ensure the best quality and a reasonable construction time.
We have planned 10 weeks for the production of one building.
After completion, the buildings are weatherproof packed and stored on the secured factory site while awaiting transport.