Everything you need is already in the sauna! Saunas
Greencube Kuumus 2
A beautiful and modern sauna house for your garden.
- Price from
- 15 990 €
All models can be adapted to your wishes. The detailed floor plan of every building is created together with the client.
Construction quality
REQUEST A PRICE. GreenCube Kuumus 2 has external dimensions of 3 × 3 × 6 m. The frame is built from 45×95 mm C24 timber studs, and all structural timber is C24 strength grade. The frame is covered with OSB board for rigidity.
The roof is finished with SBS material and edged with a sheet-metal parapet. The exterior is timber cladding treated twice with tinted wood oil. The sauna benches are oiled to extend the life of the wood and protect them against dirt.
The walls and ceiling are insulated, and the underside of the floor is protected against rodents with wire mesh.
Every detail matters!
GreenCube places great emphasis on even the smallest details. Every building that leaves our factory is finished to a high standard.
Everything you need can be included!
At the client’s request, the building can be equipped with everything needed for immediate use.
All GreenCube buildings also include a heating cable that helps prevent pipes from freezing even during severe frost.
Completed solutions
Gallery
Created with the client
Recommended floor plans
100% of floor plans are created in cooperation with the client!
Transport and installation
The building is transported to the site in three sections. The module is insured and weatherproof packed. Assembly takes up to two days.
The building is connected to utilities (electricity, water and sewerage) before final handover.
The construction process can be followed by visiting the site on working days by prior arrangement.
The buildings are completed at our production facility in Lihula. Our aim is to ensure the best quality and a reasonable construction time.
We have planned 10 weeks for the production of one building.
After completion, the buildings are weatherproof packed and stored on the secured factory site while awaiting transport.